For use of and services rendered by the waterworks system of the Edinburgh Municipal Water Utility based upon the use of water supplied by said waterworks system:
Level | Consumption Per Month | Rate Per 1,000 Gallons |
First | 3,000 gallons |
5.52 |
Next | 7,000 gallons |
4.42 |
Next | 20,000 gallons |
3.84 |
Next | 70,000 gallons |
3.30 |
Next | 100,000 gallons |
2.75 |
Over | 200,000 gallons |
2.45 |
Size of Meter | Monthly Gallonage | Monthly Charge |
5/8 inch meter | 3,000 |
16.56 |
3/4 inch meter | 3,868 |
20.40 |
1 inch meter | 5,925 |
29.49 |
1 1/4 inch meter | 8,792 |
42.16 |
1 1/2 inch meter | 12,337 |
56.47 |
2 inch meter | 21,804 |
92.83 |
3 inch meter | 53,620 |
202.25 |
4 inch meter | 75,177 |
273.38 |
6 inch meter | 150,288 |
493.59 |
8 inch meter | 240,000 |
728.30 |
10 inch meter | 345,000 |
985.55 |
Annual Fire Protection | Charge |
Public hydrants, per hydrant | 1,437.19 |
Private hydrants, per hydrant | 1,437.19 |
1 inch connection |
55.26 |
2 inch connection |
165.82 |
3 inch connection |
359.29 |
4 inch connection |
635.67 |
6 inch connection |
1437.19 |
8 inch connection |
2542.72 |
10 inch connection |
3979.93 |
Fire protection fees, per meter
Meter Size (inches) | Monthly Charge |
5/8 | 10.64 |
3/4 | 10.64 |
1 | 26.61 |
1 1/2 | 53.21 |
2 | 85.14 |
3 | 159.64 |
4 | 266.06 |
6 | 532.00 |
8 | 851.20 |
Domestic & Irrigation | $1350.00 |
Tap on charge - 5/8 inch meter | $900.00 |
Tap on charge - 1 inch meter | $1100.00 |
Asphalt Replacement Per Hole | $500.00 |
Reconnection Charge $10.00
Delinquent Fee $30.00
Non-recurring Charges
Insufficient Check Charge | 30.00 |
Meter Deposit based on meter size: | |
5/8, 3/4, and 1 inch meters | 75.00 |
1 1/2 inch meter | 125.00 |
2 inch meter | 175.00 |
3 inch meter | 225.00 |
4 inch meter | 275.00 |
6 inch meter | 325.00 |
Call Out Fee | 100.00 |
Insurance and after hours man hour and equipment costs per hour: | |
Man hour labor | 45.00 |
Vactor truck | 150.00 |
Back hoe | 125.00 |
Ditch witch | 75.00 |
Dump truck | 50.00 |
Miscellaneous materials |
110% of total Material costs |